Still working on my outdoor layout, it got pretty smashed last Jan with all the snow and downed trees. Most of the major construction is done, just one or two more concrete mountain touchup work. Got a nice loop of track done so the train can make it all the way around finally. Still have some sidings and more track to lay down but it’s getting there. Perhaps by fall? But it is almost fall so hmm.